Quantity: | |
---|---|
Stop & Waste Valves, Kitchen Gas Shut-Off Valves, Truck Shut-Off Valves
OEM, ODM
Zhejiang, China
Chunjiang
J04EK
General
Normal Temperature
Manual
Water
Angle
3-Way Angle Stop Valve
C.P. or R.B.
Brass
Brass or P.O.M
Zinc Alloy
Product name | 3-Way Angle Stop Valve |
Body | Brass |
application | thermal power,nuclear power, paper-making and chemical industries and pipelines of high-rise building water supply and drainage, air-conditioning, tap water and sewage works. |
Q1. Are you trading company or manufacturer ?
We are factory ,and we have specialized in manufacturing valves since 1972.
Q2. Is sample available?
Yes,?and welcome to take a sample order for quality check and market test.
Q3.What is your payment terms?
Payment<=1000USD,100% in advance.
Payment>=1000USD,40% T/T in advance, balance before shipment.
Q4. Can you produce products with my own brand?
Yes, we can provide OEM services.
Q5:What is your lead time ?
35-40days after your payment. The accurate time depends on your product.
Q6: What is your payment term?
Tooling: 100% T/T advanced?Main order: 40% deposit, and 60% to be paid before shipment.L/C 100% at sight is acceptable
Product name | 3-Way Angle Stop Valve |
Body | Brass |
application | thermal power,nuclear power, paper-making and chemical industries and pipelines of high-rise building water supply and drainage, air-conditioning, tap water and sewage works. |
Q1. Are you trading company or manufacturer ?
We are factory ,and we have specialized in manufacturing valves since 1972.
Q2. Is sample available?
Yes,?and welcome to take a sample order for quality check and market test.
Q3.What is your payment terms?
Payment<=1000USD,100% in advance.
Payment>=1000USD,40% T/T in advance, balance before shipment.
Q4. Can you produce products with my own brand?
Yes, we can provide OEM services.
Q5:What is your lead time ?
35-40days after your payment. The accurate time depends on your product.
Q6: What is your payment term?
Tooling: 100% T/T advanced?Main order: 40% deposit, and 60% to be paid before shipment.L/C 100% at sight is acceptable